Staged inspections

Structural warranty inspections: what happens at each stage

A PCC rests on what was seen on site while the home was being built. Here's what gets looked at, stage by stage, how many visits to expect and what you need to do so no stage is missed. The examples come from our own inspection records.

Why the build is inspected in stages

Most of what holds a house up is hidden by the time it is finished. Foundations are under concrete, wall ties are inside the cavity and the roof fixings are above the ceiling. So the checks have to happen while each part can still be seen.

That is what a lender is relying on when it asks for a Professional Consultant's Certificate (PCC). On the certificate, the consultant confirms that they visited the site during the build. A PCC is a professional certificate, not an insurance policy, and each lender decides whether to accept one, so check with yours first. Our PCC for a mortgage guide lists what to ask.

The stages, and what is looked at

On a new home the visits follow the build from the ground up. These are the stages on our inspection records, with the kind of thing noted at each one.

  • Foundations: the trenches before the concrete goes in. Depth and width are checked against the structural engineer's design and the ground on site. Our records note clay, sand and gravel, deeper foundations near trees, and piles with a ring beam where the ground called for them.
  • Floors: the ground floor before it is covered. On a beam and block floor that means the beams laid to the manufacturer's design, the damp-proof course, the air bricks and the gap under the floor. Any radon barrier is looked at here too.
  • Walls: brickwork and blockwork as it rises, or the frame. Notes cover wall ties and their spacing, steel beams sitting on their padstones, floor joists, and wall plates bedded and strapped down.
  • Roof: trusses put up to the manufacturer's design, with the bracing and the straps that hold the roof to the walls.
  • First fix and finishes: on many builds there is a visit once the inside is taking shape, with stud walls up and the first plumbing and electrics in, before plastering.
  • Completion: the last visit. Records note things like the drain test being witnessed, loft insulation, fire stopping and working smoke detectors, with the inside and outside works finished.

Not every build has every stage as a separate visit, and one visit can cover two stages when work has moved on. The stages are agreed for your project at the start. On a block of 33 apartments in Harrow, for example, they were agreed at a site meeting. Our warranty for flats guide covers what is different on a block.

How many visits to expect

It depends on the size of the scheme and how the plots are phased. These figures are from the projects on our projects page where the visits were counted:

These are what happened on those sites, not a fixed number for yours. Your quote sets out the inspections for your build. If you are building several homes to sell, see our guide for small developers.

What you need to do

  • Arrange it before you start: the foundations are the first stage and the hardest to check later. Our self-build warranty guide explains the timing.
  • Tell us before a stage is ready, not after: an inspection only works if the work is still open. Don't pour, cover or close anything up until it has been seen.
  • Have the designs on site: the structural engineer's drawings and calculations, and the manufacturer's layouts for roof trusses and beam and block floors. The work is checked against them.
  • Take dated photos as you go: they are a useful record for you and for a future buyer, and they matter a great deal if a visit is ever missed.

Are these the same as Building Control inspections?

No. They often happen at similar stages, but they are two different jobs. Building Control checks the work against the Building Regulations and, at the end, issues the completion certificate. The PCC inspections are the consultant's own visits, made so that they can sign the certificate a lender asks for. One does not replace the other, and most lenders want to see both. Our guide to a completion certificate or a warranty explains the difference.

You can arrange both through us if you want one point of contact. See other services.

If a stage has already been covered

Get in touch before anything else is closed up. What is possible depends on how much can still be seen and what records exist: photos, the engineer's details, Building Control's site notes and delivery tickets all help. Our guide to a warranty after work has started goes through it stage by stage. If the home is finished, read about a retrospective PCC, and ask your lender first, because some won't accept one.

Conversions are a little different

On a conversion the building is already standing, so there may be no new foundations to see. The visits follow the new structural work: new ground floors, steel beams and their supports, new walls and floors, and any work to the roof. On a former workhouse converted into eight homes in Melton Mowbray, the record starts at the new floors. More in our conversion warranty guide.

See real inspection records

Every project on our projects page shows its inspection record stage by stage, many with site photos. Three to start with:

What to send for a quote

  • The site address and the number of homes
  • Planning and Building Regulations drawings
  • Structural calculations, if you have them yet
  • Your start date, or the stage the build has reached
  • Anything your lender or solicitor has already asked for

Don't have everything yet? Send what you have and we'll tell you what's still needed, with a fixed quote.

Get a free quote

Common questions

Frequently asked questions

What stages are inspected for a structural warranty or PCC?

On a new home the visits usually follow foundations, floors, walls, roof and completion, often with a visit at first fix before plastering. The exact stages are agreed for your project at the start.

How many inspections will my build need?

It depends on the size of the scheme. On our own records a single house usually had between four and seven visits, and schemes of several homes had more because plots reach each stage at different times. Your quote sets out the inspections for your build.

Is a warranty inspection the same as a Building Control inspection?

No. Building Control checks the work against the Building Regulations and issues the completion certificate. PCC inspections are the consultant's own visits, made so they can sign the certificate a lender asks for. Most lenders want to see both.

What happens if a stage was covered before it was inspected?

Get in touch before anything else is closed up. What is possible depends on how much can still be seen and on records such as dated photos and the engineer's details. Our warranty after work has started guide explains the options.

When should I arrange the inspections?

Before work starts on site. The foundations are the first stage and the hardest to check afterwards, so the earlier the PCC is arranged, the simpler it is.

Do the inspections mean my lender will accept the PCC?

Not by themselves. Each lender sets its own rules, and some don't accept a PCC at all. Ask your lender or broker before you start and get the answer in writing.

Starting on site soon?

Send your drawings and your start date. We'll set out the inspections your build needs and give you a fixed quote.