PCC & structural warranty specialists, UK-wide enquiries@onestopconsult.co.uk02475 095700

Timber frame homes

Timber frame warranty: what lenders and inspectors look for

A timber frame home goes up fast, and a lot of the structure is hidden within days. Here's whether it can have a PCC, what lenders ask about the walls, and why the timing matters more than on a brick and block build.

Can a timber frame home have a PCC?

Yes, it can be considered in the same way as any other new home. A Professional Consultant's Certificate (PCC) is about how the build was checked, not what it is built from. We have inspected timber frame homes from the foundations to completion, and three of them are shown further down this page.

Two things decide whether a PCC is the right route for you: what your lender will accept, and whether the key stages can be inspected before they are covered up. A PCC is a professional certificate, not an insurance policy, and not every lender accepts one. If you're unsure which you need, read PCC or structural warranty.

What lenders ask about a timber frame home

Lenders ask two separate questions about a new timber frame home, and it helps to keep them apart.

  • How is it built? Lenders set their own rules on types of construction. Many treat a modern timber frame home with a brick or stone outer wall as standard construction. Homes where cladding or render is fixed straight to the frame get more questions, and some lenders won't lend on them. The rules differ from lender to lender and they change.
  • Was the build checked? For a newly built home, lenders generally want a warranty or a PCC as well. This applies whatever the home is built from. Our PCC for a mortgage guide lists what to ask.

So before you order the frame, tell your lender or broker exactly how the walls will be built, inside and out, and ask whether they will accept a PCC for it. Get the answer in writing. If you might sell within ten years, remember that your buyer's lender will ask the same two questions.

Why timing matters more with timber frame

On a brick and block build the walls rise over weeks. A timber frame can be standing in days, and the membrane, insulation and outer wall follow close behind. Once they are on, the frame and its fixings can't be seen.

That is why it pays to arrange the PCC before work starts on site. The inspections can then be booked around the frame delivery, so each stage is seen while it is still open. It is also the simplest and lowest-cost route. If you're borrowing to build, our self-build warranty guide covers stage payments and who signs each stage.

What gets inspected on a timber frame build

The stages are the same as for any new home: foundations, floor, superstructure and roof, then completion. On a timber frame home, these are the kind of things looked at along the way, taken from our own inspection records:

  • Foundations and floor: depth and width of the foundations for the ground conditions, and the ground floor before the frame lands on it.
  • The frame itself: that it has gone up to the supplier's design and is fixed down at the base.
  • Steel and other structure: any steel beams or posts, installed to the structural design.
  • Membrane and insulation: the breathable membrane on the outside of the frame and the insulation within it, before they are closed in.
  • The outer wall: the brick or block skin, and how it is tied back to the frame.
  • Roof and completion: the roof structure, then the completion evidence and Building Control sign-off.

The frame supplier's guarantee is not a warranty

Many frame suppliers give a guarantee on the frame they make. That is worth having, but it covers their product. It does not say the whole home was inspected as it was built, and it is not what a lender or a buyer's solicitor means when they ask for a structural warranty or a PCC. You will usually be asked for that separately, along with the Building Control completion certificate.

Timber frame homes we've inspected

Each of these has its own page showing the stages we visited, with site photos:

We have also inspected seven modular homes at Gatehouse Road, Aylesbury. If you are building with another system, such as structural insulated panels or insulated concrete formwork, tell us which one and send the supplier's details. We'll tell you whether a PCC is possible before you commit to anything.

The frame is already up?

Get in touch before the next stage is covered. What's possible depends on how much can still be seen and what records exist. Keep the supplier's drawings, delivery and erection records, and take dated photos of the frame, its fixings, the membrane and the wall ties now, while you can. Our guide to a warranty after work has started explains the options stage by stage. If the home is finished, see retrospective PCC, and check with your lender first, because some won't accept one.

What to send for a quote

  • The site address and the number of homes
  • Planning and Building Regulations drawings
  • The frame supplier's drawings and structural calculations, if you have them yet
  • What the outer walls will be: brick, block and render, or cladding
  • Your start date and the expected frame delivery date, or how far the build has got
  • Anything your lender or solicitor has already asked for

Don't have everything yet? Send what you have and we'll tell you what's still needed, with a fixed quote.

Get a free quote

Common questions

Frequently asked questions

Can a timber frame house get a structural warranty or PCC?

Yes, it can be considered like any other new home. We have inspected timber frame homes from the foundations to completion. Whether a PCC suits you depends on what your lender will accept, so check that before you order the frame.

Do mortgage lenders accept timber frame houses?

Each lender sets its own rules. Many treat a modern timber frame home with a brick or stone outer wall as standard construction. Homes with cladding or render fixed straight to the frame get more questions, and some lenders won't lend on them. Tell your lender or broker exactly how the walls will be built and get the answer in writing.

Is the timber frame supplier's guarantee the same as a structural warranty?

No. A supplier's guarantee covers the frame they made. A structural warranty or PCC relates to the whole home and how it was inspected as it was built, and that is what lenders and buyers' solicitors ask for.

When should I arrange a PCC for a timber frame build?

Before work starts on site. A timber frame goes up in days and is quickly covered by membrane, insulation and the outer wall, so inspections need to be booked around the frame delivery.

The frame is already up. Is it too late?

Not always. It depends on how much can still be seen and what records you have. Keep the supplier's drawings and take dated photos now, and get in touch before the next stage is covered. Our warranty after work has started guide explains more.

Do you cover oak frame, modular or other building systems?

We have inspected an oak and timber frame house and a scheme of seven modular homes, both shown on our projects page. For other systems, tell us which one and send the supplier's details, and we'll tell you whether a PCC is possible.

Building in timber frame?

Send your drawings, the frame supplier's details and your start date. We'll confirm what's needed and give you a fixed quote.

Call us Get a free quote