Halls Crescent, Sharnford: new build covered by a 10 year structural warranty

New build ยท 10 Year Structural Warranty

Halls Crescent, Sharnford

Two pairs of semi-detached dormer bungalows and a double garage on a piled foundation at Halls Crescent, Sharnford.

  • 4 homesScheme
  • 4Inspection visits recorded
  • 3Build stages logged
  • 2026Year
  • Inspections ongoingStatus

Inspection record

The build, stage by stage

Each stage was seen before it was covered up. This is the record the warranty is built on.

  1. Stage 1

    Foundations

    Piling was completed and ring beam reinforcement went in to the structural engineer's design.

    Halls Crescent, Sharnford: foundations stage inspection
  2. Stage 2

    Floors

    Substructure brick and blockwork reached dpc, with party walls formed and ready for the floor beams.

    Halls Crescent, Sharnford: floors stage inspection
  3. Stage 3

    Roof

    Roof felt and tile battens were going on, with over fascia ventilation and a dry verge system.

    Halls Crescent, Sharnford: roof stage inspection
  4. Next

    Final review and certificate

    Once the remaining stages and the completion evidence are in, the 10 year structural warranty certificate can be issued.