Havenfield Road, High Wycombe: new build covered by a 10 year structural warranty

New build ยท 10 Year Structural Warranty

Havenfield Road, High Wycombe

Four flats in a two-storey residential building for a repeat client on Havenfield Road, High Wycombe.

  • 4 homesScheme
  • 9Inspection visits recorded
  • 5Build stages logged

Inspection record

The build, stage by stage

Each stage was seen before it was covered up. This is the record the warranty is built on.

  1. Stage 1

    Foundations

    Piling and the ring beam were complete, with a radon barrier in position and taped to the sub base membrane.

    Havenfield Road, High Wycombe: foundations stage inspection
  2. Stage 2

    Walls

    The ground floor superstructure went up on a sole plate with a damp-proof course beneath it.

    Havenfield Road, High Wycombe: walls stage inspection
  3. Stage 3

    Roof

    The roof went on over the frame, with its design revised by the manufacturer along the way.

    Havenfield Road, High Wycombe: roof stage inspection
  4. Stage 4

    First fix

    Internal work moved on and smoke ventilation to the communal areas was covered with the site manager.

    Havenfield Road, High Wycombe: first fix stage inspection
  5. Stage 5

    Finishes

    The outside of the building was finished and the last internal work was running on the ground floor.

    Havenfield Road, High Wycombe: finishes stage inspection
  6. Signed off

    Warranty certificate

    With the inspections done and the completion evidence in, the 10 year structural warranty certificate could be issued.

Case study

What made this one interesting

The challenge

The building sits on piles and a ring beam, with a radon barrier taped across it to the sub base membrane. The superstructure was then built up on a sole plate with precast concrete beams. The roof design changed several times along the way.

How it was handled

We made nine visits between March 2023 and November 2025, following the job from the ring beam through the superstructure and roof to the internal work. Stages were walked with the site manager on each visit. Smoke ventilation to the communal stair was covered as the building came together.

The result

By July 2025 roof tiling was complete and the automatic opening vent to the staircase was fitted. The outside of the building was finished by November 2025, with the last internal work then running on the ground floor, and the job has since been completed.