Hinckley Road, Stoney Stanton: new build covered by a 10 year structural warranty

New build ยท 10 Year Structural Warranty

Hinckley Road, Stoney Stanton

A detached house, a bungalow and a two-storey rear extension built on Hinckley Road, Stoney Stanton.

  • 2 homesScheme
  • 9Inspection visits recorded
  • 6Build stages logged
  • 2026Year
  • Inspections ongoingStatus

Inspection record

The build, stage by stage

Each stage was seen before it was covered up. This is the record the warranty is built on.

  1. Stage 1

    Foundations

    Foundations on the first plot were dug 1.0m deep and 0.6m wide into medium shrinkable clay.

    Hinckley Road, Stoney Stanton: foundations stage inspection
  2. Stage 2

    Floors

    The block and beam floor went in with air bricks fitted and a 250mm air void under the precast beams.

    Hinckley Road, Stoney Stanton: floors stage inspection
  3. Stage 3

    Roof

    Roof trusses went up and were inspected on site.

    Hinckley Road, Stoney Stanton: roof stage inspection
  4. Stage 4

    First fix

    First fix carpentry, plumbing and electrics were completed, with the ventilated ridge system in position.

    Hinckley Road, Stoney Stanton: first fix stage inspection
  5. Stage 5

    Finishes

    All internal and external works were complete on the first phase, with the driveway laid and gutters connected.

    Hinckley Road, Stoney Stanton: finishes stage inspection
  6. Stage 6

    Roof

    On the later phase roof tiling was completed, with steel beams and a wind post bolted in place.

    Hinckley Road, Stoney Stanton: roof stage inspection
  7. Next

    Final review and certificate

    Once the remaining stages and the completion evidence are in, the 10 year structural warranty certificate can be issued.

Case study

What made this one interesting

The challenge

Three builds shared one site: a new house, a new bungalow and a two-storey extension to the existing house. The ground was medium shrinkable clay, and water had to be pumped out of the trenches before concrete went in. The work ran in phases from 2023 into 2026.

How it was handled

We made nine inspection visits, covering foundations, block and beam floors, roofs and first fix across the phases. Alongside them we coordinated SAP calculations, air tightness and ventilation testing, Energy Performance Certificates and water efficiency calculations.

The result

The first phase finished in November 2023 with all internal and external works complete and the driveway laid. The later phase is still running, and by September 2026 its roof tiling was complete with a mechanically fixed ventilated ridge.

On site

More photos from Stoney Stanton