The build, stage by stage
Each stage was seen before it was covered up. This is the record the warranty is built on.
-
Next
Final review and certificate
Once the remaining stages and the completion evidence are in, the 10 year structural warranty certificate can be issued.
Case study
What made this one interesting
The challenge
Four apartments and four houses had to fit inside a building dating from 1836. That meant new internal foundations, block separating walls and a new first floor inside the old external walls. The existing walls were repointed and a new ridge beam went into the existing roof.
How it was handled
We made seven inspection visits through the conversion. They covered the internal foundations, new ground floors, steelwork on padstones, the new first floor and roof, then plasterboarding and second fix. Alongside them we coordinated SAP calculations for the conversion, air tightness, sound insulation and ventilation testing, Energy Performance Certificates and water efficiency calculations.
The result
At the visit on 22 July 2026 all internal and external works were complete across the four townhouses and four apartments. Building Control has started issuing the final certificates, with the last few to follow.
Need a 10 Year Structural Warranty (PCC)?
Send your drawings and project details. We'll review what's needed and come back with a clear, fixed quote.